CB-2Automated Concrete Batching SystemVersion 2.0Installation/Operation Manual93603
6 Installation/Operation Manual2.1 Important Notes2.1.1 Two Power SourcesThe CB-2 requires two separate power sources to run. The power cord that cam
Installation/Operation Manual - Installation 72.2 CB-2 Main Junction BlockThe CB-2 main junction box provides access for outside power to be brought
8 Installation/Operation Manual2.3 Load CellsThe CB-2 comes pre-wired at the factory. Figure 2-4 shows the loadcell connections on the lower row.
Installation/Operation Manual - Installation 9For units containing three load cells, the following table and diagram illustrate the load cell connect
10 Installation/Operation Manual2.3.1 Serial CommunicationsThe CB-2 supports RS-232 communications and their connections are shown in Figure 2-6, bel
ContentsAbout This Manual ...
2 CB-2 Installation Manual6.4 Diagnostics . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Installation/Operation Manual - Safety 1About This ManualThis manual is intended for use by service technicians responsible for installing and servic
2 Installation/Operation Manual1.0 IntroductionThe CB-2 is a versatile, efficient concrete batching control system ideal for ready-mix, central mix,
Installation/Operation Manual - Introduction 3Front PanelThe 920i front panel, shown in Figure 1-1, consists of a 27-button keypad with a large backl
4 Installation/Operation Manual1.2 Indicator OperationsThe CB-2 does not allow the 920i to execute any of its standard operations like Gross/Net, Uni
Installation/Operation Manual - Installation 52.0 InstallationThis section explains the main junction box, load cell, digital I/O, and serial communi
Comentarios a estos manuales