
10 880 Technical/Service Manual
2.0 Installation
This section describes procedures for connecting load cells, digital I/O, and serial communications cables to the
880 indicator. Instructions for replacement of the circuit boards are included, along with assembly drawings and
parts lists for the service technician.
• Use a wrist strap to ground yourself and protect components from electrostatic discharge (ESD) when working inside
the indicator enclosure.
• Procedures requiring work inside the indicator must be performed by qualified service personnel only.
• The supply cord serves as the power disconnect for the
880. The power outlet supplying the indicator must be installed
near the unit and be easily accessible.
2.1 Unpacking and Assembly
Immediately after unpacking, visually inspect the 880 to ensure all components are included and undamaged. The
shipping carton should contain the controller, display, Operator's Manual, CD and parts kit.
If any parts were
damaged in shipment, notify Rice Lake Weighing Systems and the shipper immediately.
2.1.1 Parts Kit Components
The following items are found in the parts kit:
Table 2-1. Parts Kit
Parts Kit, AC Power (PN 152235) Parts Kit, DC Power (PN 153647)
Part No Description Part No Description
14621 Nut, Kep 6-32NC Hex 14621 Nut, Kep 6-32NC Hex
15130 Washer, Lock No 6 Type A 15130 Washer, Lock No 6 Type A
152334 Conn, 3 Pos Screw Terminal 15888 Terminal Block, 3 position
153873 Conn, 3 Pos Screw Terminal 153873 Conn, 3 Pos Screw Terminal
153883 Conn,6 Pos Screw Terminal 153883 Conn,6 Pos Screw Terminal
157074 Ferrite,EMI/RFI Clamp-on 157074 Ferrite,EMI/RFI Clamp-on
53075 Clamp,Ground Cable Shield 53075 Clamp,Ground Cable Shield
67550 Clamp,Ground Cable Shield 67550 Clamp,Ground Cable Shield
94422 Label,Capacity .40 x 5.00 94422 Label,Capacity .40 x 5.00
Comentarios a estos manuales